PIPELINE TO "H" RESERVOIR AND "H" RESVOIR PUMP STATION
Summary
SCH Number
1995101353
Lead Agency
Vista Irrigation District
Document Title
PIPELINE TO "H" RESERVOIR AND "H" RESVOIR PUMP STATION
Document Type
NOD - Notice of Determination
Received
Posted
8/21/1995
Document Description
CONSTRUCTION OF A 30 INCH POTABLE WATER PIPELINE FROM THE PROPOSED WARMLANDS PRESSURE REDUCING STATION EASTERLY ALONG WARMLANDS AVENUE AND PLEASANT HEIGHTS DR. AND CON- STRUCTION OF A 3,000 GALLON PER MINUTE PUMP STATION AT THE
Contact Information
Name
BRIAN SMITH
Agency Name
VISTA IRRIGATION DISTRICT
Contact Types
Lead/Public Agency
Phone
Location
Cities
Vista
Counties
San Diego
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.