Del Dios Gorge Trail

14 Documents in Project

Summary

SCH Number
1995081014
Lead Agency
San Diego County
Document Title
Del Dios Gorge Trail
Document Type
NOD - Notice of Determination
Received
Posted
1/30/2007
Document Description
The Operator proposes to alter 0.64 acre of streambed and floodplain of the San Dieguito River to accommodate the construction of the Del Dios Gorge Trail Segment of the JPA Coast-to-Crest Trail. Project activity includes construction of a 12-foot wide, 180-foot long steel fabricated bridge. Concrete bridge abutments will be constructed on both ends of the bridge for support. A temporary 20-foot wide, by 350-feet long access road and 20-foot by 150-foot staging area will also be constructed. The trail segment is 8-feet wide and will be either dirt or decomposed granite. The access road, staging area and bridge construction is scheduled for January 1st to March 15th, and because raptors are in the project area, preconstruction surveys will be carried out prior to vegetation removal. Trail construction (which impacts coastal sage) is scheduled to occur between September 15th and March 15th. SAA# 1600-2006-0300-R5

Contact Information

Name
Tamara Spear
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Regions
Unincorporated
Cross Streets
DEL DIOS HIGHWAY
State Highways
I-15

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print