Supplemental EIS/EIR for the Transbay Transit Center Program

16 Documents in Project

Summary

SCH Number
1995063004
Lead Agency
Transbay Joint Powers Authority
Document Title
Supplemental EIS/EIR for the Transbay Transit Center Program
Document Type
NOP - Notice of Preperation
Received

Document Description
Note: Reference SCH# 2001032088 The proposed project consists of refinements to the previously approved Downtown Rail Extension (DTX) throat structure, the extension of the underground rail levels to accommodate high-speed trains, and other refinements in Transbay Transit Center Program elements and/or new project details. The project will complete the 1.3-mile rail extension from Fourth and King Streets underground into the new Transit Center (now under construction) and will also allow for future high-speed trains to arrive in and depart from downtown San Francisco. The primary purposes of the Project, as defined in the Transbay Transit center Program 2004 FEIS/EIR, are to improve public access to bus and rail services by replacing the former Transbay Terminal with a new Transit Center, reduce non-transit vehicle usage, and revitalize the area surrounding the new Transit Center. An additional purpose identified in the 2004 FEIS/EIR is to accommodate future high speed rail. The refinements to Phase 2 Program elements area required to accommodate updated design specifications that were released by the California High-Speed Rail Authority in 2010 regarding track curvature and platform design. The other refinements concerning localized transportation and transit improvements and ventilation shaft locations reflect advanced design consideration and opportunities that were not available at the time of the 2004 FEIS/EIR.

Contact Information
Scott Boule
Transbay Point Powers Authority/Federal Transit Administration
201 Mission Street, Suite 2100
San Francisco, CA 94105

415 597-4620

Location

Coordinates
37°47'10.87"N 122°23'51.82"W
Cities
San Francisco
Counties
San Francisco
Cross Streets
Main Street, Second Street, Townsend Street, Minna Street, Natoma Street
Zip
94105
Parcel #
Multiple
State Highways
Hwy 101
Railways
Caltrain, Muni Metro
Waterways
San Francisco Bay

Notice of Completion

Review Period Start
Review Period End
Development Type
Transportation:Rail (Transit (8 acres))
Local Action
Redevelopment Use Permit Rezone Site Plan Specific Plan Community Plan General Plan Update
Project Issues
Cumulative Effects Landuse Water Supply Water Quality Traffic/Circulation Toxic/Hazardous Solid Waste Sewer Capacity Septic System Schools/Universities Recreation/Parks Public Services Population/Housing Balance Noise Geologic/Seismic Flood Plain/Flooding Economics/Jobs Drainage/Absorption Biological Resources Archaeologic-Historic Air Quality
Reviewing Agencies
Caltrans, District 4 Air Resources Board, Transportation Projects California Coastal Commission California Department of Parks and Recreation California Highway Patrol California Public Utilities Commission Caltrans, Division of Aeronautics Caltrans, Division of Transportation Planning Department of Fish and Wildlife, Region 3 Department of Toxic Substances Control Department of Water Resources Native American Heritage Commission Office of Historic Preservation Regional Water Quality Control Board, Region 2 Resources Agency
Download CSV New Search