Waldo Point Harbor Rezoning, Master Plan, Precise Development Plan, and Special Area Plan Amendment

7 Documents in Project

Summary

SCH Number
1995043050
Lead Agency
Marin County
Document Title
Waldo Point Harbor Rezoning, Master Plan, Precise Development Plan, and Special Area Plan Amendment
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2003
Present Land Use
Houseboat Marina Zoning: Bayfront Conservation-Residential Floating Home (BFC-RF) & Bayfront Conservation-Resort Commercial Recreation (BFC-RCR); CWP Land Use Designation = Floating Homes (FH)
Document Description
Proposal to reauthorize, reconfigure, and expand the existing 245-berth Waldo Point Harbor houseboat marina located along the Richardson Bay shoreline in Sausalito. The project expansion would accommodate 38 Gates Cooperative houseboats in legal berths along existing docks as well as on a new dock constructed north of the existing Main Dock. A new parking lot for 134 vehicles and minor modifications to existing parking areas would result in a total of 484 private and 10 public parking spaces. Improvements include construction of a shoreline park and access pathway along the site perimeter. Land exchange between Waldo Point Harbor and a State lands Commission would provide Waldo Point Harbor with fee title to submerged lands within the marina under existing and proposed docks and houseboat berths, and would provide the State with fee title to most of the open space and open water areas within the marina, which would be made available for public trust purposes or retained in a natural state.

Contact Information

Name
Christine Gimmler
Agency Name
Marin County Community Development Agency
Contact Types
Lead/Public Agency

Location

Cities
Sausalito
Counties
Marin
Cross Streets
Gate 5 and Gate 6 Roads and Bridgeway Boulevard
Zip
94965
Total Acres
45.2
Parcel #
052-301-04 & 08, various
State Highways
101
Airports
Heliport (Heli USA)
Schools
North Bay Elementary
Waterways
Richardson Bay

Notice of Determination

Approving Agency
Board of Supervisors
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print