Route Location, Adoption and Construction of State Route 905

6 Documents in Project

Summary

SCH Number
1995031031
Lead Agency
San Diego, City of (City of San Diego)
Document Title
Route Location, Adoption and Construction of State Route 905
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2004

Document Description
The proposed project would construct Route 905 (six travel lanes [three in each direction] and each would have a wide median for possible, future HOV lanes) from Interstate 805 to the Otay Mesa Port of Entry with Mexico, a distance of approximately 10 kilometers (6.2 miles). Local interchanges would be constructed at Caliente Avenue, Heritage Road, Britannia Boulevard, and La Media Road as would a freeway to freeway interchange at Route 125. The project purpose is to provide for effective transportation of people, goods, and services between Interstate 805 and the Otay Mesa Port-of-Entry. Alternatives assessed in the Draft EIS/EIR were: a no build alternative and six build alternatives. The Freeway-Central Alignment Alternative has been identified as the Preferred Alternative and the Least Environmentally Damaging Practicable Alternative.

Contact Information
John Chisholm
Caltrans
1120 N Street
Sacramento, CA 95814

Phone : (858) 616-6610

Location

Cities
STATEWIDE
Counties
San Diego

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Caltrans District 11 2829 Juan Street San Diego, CA 92186

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print