Adobe Creek Upper Reach 5
7 Documents in Project
Summary
SCH Number
1995013041
Lead Agency
Santa Clara Valley Water District
Document Title
Adobe Creek Upper Reach 5
Document Type
NOD - Notice of Determination
Received
Posted
11/28/2007
Present Land Use
Residential
Document Description
The project proposes to construct improvements in Reach 5 of Adobe Creek to restore the eroded channel, stabilize creek banks, remove accumulated sediment under the West Edith Avenue Bridge, improve the channel conveyance capacity, and allow for overland flow during flood events. The project proposes a modified natural geomorphic design with a limited channel top width for the first 500 feet and a geomorphic design with step pools for the following 200 feet. Bank stabilization and erosion repairs would be constructed in the remaining 400 feet downstream. The project is located along Reach 5 of Adobe Creek in Los Altos and Los Altos Hills. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2007-0452-3 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Kristen O'Kane / Santa Clara Valley Water District.
Contact Information
Name
Tami Schane
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Altos, Los Altos Hills
Counties
Santa Clara
Cross Streets
W. Edith Avenue and Fremont Road
Zip
94122
Total Acres
1.0
Parcel #
Multiple
State Highways
280
Railways
Caltrain (Central Expressway)
Waterways
Adobe Creek
Township
6S
Range
2W
Section
30
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.