Modifications to the Santa Rosa Subregional Long-Term Wastewater Project: Modification C, Pine Flat Modified Alignment and G3 Powerline Pump Station
19 Documents in Project
Summary
SCH Number
1994103069
Lead Agency
City of Santa Rosa
Document Title
Modifications to the Santa Rosa Subregional Long-Term Wastewater Project: Modification C, Pine Flat Modified Alignment and G3 Powerline Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2000
Document Description
The Santa Roas Sunregional Long-Term Wastewater Project includes improvements to the Laguna Treatment Plant, construction of a buried transmission pipeline of approximately 40 miles long to supply 11 mgd of reclaimed water to the Geyers steamfield for recharge via a network of distribution pipes and injection wells. Four high-pressure pump stations will lift the water in steps up to the Geysers. The remaining flow of reclaimed water from the Subregional System will be used for the existing irrigation system in the Santa Rosa Plain or will be discharged through the existing discharge system at a rate not to exceed 5 percent of Russian River flows.
Contact Information
Name
Dan Carlson
Agency Name
City of Santa Rosa
Contact Types
Lead/Public Agency
Phone
Location
Cities
Santa Rosa
Counties
Sonoma
Cross Streets
Numerous
Total Acres
130
Parcel #
Approximately 400, see Appendix F of Supplemental EIR
State Highways
101,12,16
Railways
Nothwestern Pacific
Airports
Sonoma County Airport
Waterways
Russian River, Santa Rosa Creek, Laguna de Santa Rosa
Township
6N,7N
Range
8/9W
Section
variou
Base
Mt diabl
Other Location Info
Northeast of Healdsburg: Pine Flat Road and cross-country segments extending from Pine Flat Road at Highway 128 to just north of Bear Canyon and from Pine Flat Road just below Anna Belcher Creek to the terminal tanks at the Geysers streamfield.
Notice of Determination
Approving Agency
City of Santa Rosa
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.