City of San Diego Point Loma Grit Processing Improvement Project; Clean Water State Revolving Fund (CWSRF) No. C-06-4395-110

9 Documents in Project

Summary

SCH Number
1994101024
Lead Agency
City of San Diego
Document Title
City of San Diego Point Loma Grit Processing Improvement Project; Clean Water State Revolving Fund (CWSRF) No. C-06-4395-110
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2010
Document Description
Major Project components include reconstructing the south grit tanks and adjacent pump gallery and replacing the grit processing headworks building with an odor controlled drive through facility and new grit processing equipment. Improvements to the south grit tanks include: widening and deepening the channels and relocating the tank influent and effluent ports to increase detention time, increasing the slope of the tank bottoms to promote grit migration, and installing longitudinal and transverse baffles to enhance grit removal. The new headworks building will include grit storage and loading facilities. New gravitational classifiers will replace the existing cyclone grit separators. The building will provide through loading capability and new odor control equipment to help with odor containment.

Contact Information

Name
Michelle Lobo
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Cabrillo Memorial Drive and Gatchell Road
Total Acres
0.2
Parcel #
532-520-0600
Waterways
Pacific Ocean and San Diego Bay

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.