Grit Processing Facility Upgrades

11 Documents in Project

Summary

SCH Number
1994101024
Lead Agency
City of San Diego
Document Title
Grit Processing Facility Upgrades
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2003
Present Land Use
Industrial
Document Description
City Council approval to allow for improvements to the grit collection and removal processes at the Point Loma Wastewater Treatment Plant. The project would replace the existing headworks building with a new facility, upgrade the existing odor removal system, and reconstruct the inactive south grit tanks and associated pumps. The project was previously analyzed under EIR 94-0510 (SCH 94101024) and updated by this addendum. The project site is located in a previously developed, existing industrial site at the E. W. Blom Point Loma Wastewater Treatment Plant, 1902 Gatchell Road northwest of Cabrillo National Monument, in the Peninsula Community Planning Area, Council District 2.

Contact Information

Name
Cory Wilkinson
Agency Name
City of San Diego Planning & Development Review Department
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Cabrillo Memorial Drive and Gatchell Road
Total Acres
0.2
Parcel #
532-520-0600
Waterways
Pacific Ocean and San Diego Bay

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print