STPUD A-LINE EXPORT PIPELINE RELOCATION PROJECT

4 Documents in Project

Summary

SCH Number
1994062040
Lead Agency
United States Environmental Protection Agency (EPA)
Document Title
STPUD A-LINE EXPORT PIPELINE RELOCATION PROJECT
Document Type
NOD - Notice of Determination
Received
Posted
9/29/1999
Document Description
The STPUD A-line Phase III project entails replacing approximately 5,475 feet of the existing 24-inch pipeline with a 30-inch pipeline. Direcitonal drilling will be used to place the pipeline, which will extend from the Wastewater Treatment Plant, cross under Trout Creek to Barbara Avenue, parallel Barbara Ave. to the intersection with Beecher Ave., and end near the STPUD Upper Truckee River Pump Station,. A portion of the pipeline includes 1,100 feet below the Trout Creek Stream Environment Zone. There will be no impacts to SEZs. The STPUD proposes to use CTC-owned parcels as a staging area for heavy equipment and the temporary site for welding sections of the new steel pipe together (prior to placement). The pipe will be set 1 foot off the ground on large rollers that will extend (approximately 1,100 feet) over up to 17 parcels along Barbara Avenue. Staging will be required ofr approximately 2 weeks and may involve removing some sagebrush and a few small Jeffrey pines (less than 6" dbh), which is not significant.

Contact Information

Name
Renee T. Dixon
Agency Name
California Tahoe Conservancy
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
CHINQUAPIN
Parcel #
25-061-30
State Highways
50 & 89
Airports
LAKE TAHOE

Notice of Determination

Approving Agency
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.