California State University, Fresno, Approval of Schematic Plans, Library Addition and Renovation

3 Documents in Project

Summary

SCH Number
1994032022
Lead Agency
California State University Board of Trustees
Document Title
California State University, Fresno, Approval of Schematic Plans, Library Addition and Renovation
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2005
Document Description
This project will renovate the existing four-story (91,000 gsf) portion of the library. This combined space will accommodate the master plan enrollment of 25,000 fte. The addition will consist of a four-story structure above grade with a one-story basement. The exterior skin will be comprised of pre-cast concrete over a structural steel frame system. The new and existing structures will be connected on the first floor by an existing atrium walkway and on the second floor by a bridge. The project will incorporate several sustainable features, including building orientation, extensive use of recycled materials, the use of day-lighting with an emphasis on natural light from the north, a focused effort to use and specify local building materials and water conservation technologies. The majority of the library collection will be housed in the basement utilizing high density compact shelving, freeing up the upper floors for open stacks, reader stations, technical and public areas, and media storage. The addition will also provide space for circulation, government documents, reference and map libraries, periodicals, information competency centers, collaborative learning areas, juvenile curricula, and the music library. Additionally it will include administrative space to alleviate the campus space shortage. The renovated facility will accommodate the non-reference functions of the library administration and the special collections so that it may be shut down during later operating hours.

Contact Information

Name
Gary Wilson
Agency Name
Trustees of the California State University, Long Beach
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Cross Streets
SHAW AND CEDAR AVENUES
State Highways
168,41
Airports
FRESNO AIR TERM
Waterways
DRY CREEK
Township
13S
Range
20e
Section
11,+
Base
MDB&M

Notice of Determination

Approving Agency
Trustees
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.