Haskell's Landing

7 Documents in Project

Summary

SCH Number
1993121097
Lead Agency
Livermore Valley Joint Unified School District
Document Title
Haskell's Landing
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2010
Document Description
The Applicant intends to alter Devereux Creek by removing silt within the property boundaries south of Union Pacific Railroad right of way, grading the banks at the upper banks at the upper reach, providing an minimum 50 ft set back from the top of the bank on both sides of the creek, and 100 ft set back from the wetland, and constructing two span bridges. The project includes the removal of non-native plants from the channel, coyote brush, and replacing the vegetation with native species. The entire project consists of a residential development with 101 units with single family homes and town homes. The development will be located on both sides of the creek, with the two bridges connecting the homes. The creek will be designed as a green belt with pedestrian paths along corridor.

Contact Information

Name
Natasha Lohmus
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Las Armas/Cathedral Oaks Road/Hollister Avenue/Winchester Canyon Road
Total Acres
17.4
Jobs
6
Parcel #
079-210-049
State Highways
101
Railways
UPRR
Airports
Santa Barbara
Schools
Goleta Union/Ellwood
Waterways
Devereux Creek/Slough/Bell Canyon Creek/Pacific Ocean

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print