Addendum to FUA #2 Specific Plan

7 Documents in Project

Summary

SCH Number
1993111069
Lead Agency
City of Antioch
Document Title
Addendum to FUA #2 Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
5/28/2010
Document Description
The Park Ridge Project includes a rezone, an approved Vesting Tentative Map, Final Development Plan, and Use Permit identifying a total of 525 single-family residential homes. The Project also includes an 8.22 acre neighborhood park designed to serve the FUA #2 Specific Plan area, 25.5 acres of dedicated central open space, approximately 36.1 acres of public streets, and 11.7 acres of residential parcels. A lot line adjustment or righ-of-way acquisition will be required as part of the approved Project to modify the common boundary with the adjoining Delizia Ranch LLC and Nunn properties, located along the planned extension of Country Hills Drive. In order to complete build-out of the Project, Country Hills Drive will be extended ~400 ft north from the Project boundary to connect with a westerly extension of Laurel Road, and Laurel Road will be extended east from the project's northwestern boundary to connect with the State Route 4 Bypass. Construction of these roadway segments and the Laurel Road / County Hills Drive intersection will provide an additional local access to the Bypass. These off-site improvements will necessitate an additional right-of-way acquisition through the adjoining properties.

Contact Information

Name
Mindy Gentry
Agency Name
City of Antioch
Contact Types
Lead/Public Agency

Location

Cities
Antioch
Counties
Contra Costa

Notice of Determination

Approving Agency
City of Antioch
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.