State Route 108-East Sonora Bypass II Project-Agreement 2009-0088-R4

8 Documents in Project

Summary

SCH Number
1993024006
Lead Agency
United States Department of Transportation, Federal Highway Administration
Document Title
State Route 108-East Sonora Bypass II Project-Agreement 2009-0088-R4
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2009
Document Description
Caltrans proposes the following work: At Location 1 (north of PM 4.6): The unnamed drainage that runs parallel to Little Creek Road and serves primarily for transporting storm water runoff. The portion of the drainage that will run under the new SR 108 will be culverted with a 48 inch alternative pipe culvert (APC) to extend the width of the new highway by 244.82 ft. At Location 2 (east of PM 4.9): The proposed Project includes a bridge over the existing SR 108 and the Tributary to Curtis Creek. With the construction of this bridge, the creek would need to be slightly realigned to run along the toe of the fill slope. Caltrans is proposing to line the newly aligned section of the creek with fabric and Rock Slope Protection. The total area of permanent impact would be 0.87 acres with 462.06 linear ft of channel affected. These impacts are included as a part of those calculated for the parent Project, the East Sonora Bypass Stage 2. Construction activities will occur during low flow conditions; however, water diversion may be required.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sonora
Counties
Tuolumne

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes