Sonoma County Water Agency Water Supply and Transmission System Project.
6 Documents in Project
Summary
SCH Number
1993023038
Lead Agency
Sonoma County Water Agency
Document Title
Sonoma County Water Agency Water Supply and Transmission System Project.
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2001
Document Description
Amendment 11 obligates the Agency to (1) construct or acquire additions to the existing transmission system to meet increased delivery entitlements established by the agreement to reliably deliver such entitlements and to make the deliveries authorized to be made to Mari Municipal by the agreement; (2) construct additional Russian River water production capacity available at all times is not less than the average daily delivery to the regular customers and Marin Municipal (excluding surplus water and water in excess of entitlement(s) during the month of the highest historical use plus 20 mgs; (3) construct emergency wells with capacities which are from time to time determined by the water contractors; (4) construct additional storage facilities to the extent necessary to maintain a quantity equal to 1.5 times the average daily delivery to the regular customers except North Marin during the month of highest historical use; (5) replace existing facilities and construct additional facilities, related buildings and appurtenances as necessary to insure the reliable and efficient operation of the transmission system and the quality of the water delivered; and (6) require the water contractors, and the Agency, to implement or use their best efforts to secure the implementation of urban water conservation best management practices, or alternative water conservation measures that secure at least the same level of water savings.
Contact Information
Name
Tom Hargis
Agency Name
City of Petaluma
Contact Types
Lead/Public Agency
Phone
Location
Cities
Cotati, Petaluma, Rohnert Park, Santa Rosa, Sonoma
Counties
Sonoma
Notice of Determination
Approving Agency
City of Petaluma
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.