Otay Mesa Corrections Facility Project (SAA #1600-2008-0103-R5)
35 Documents in Project
Summary
SCH Number
1992101099
Lead Agency
San Diego County
Document Title
Otay Mesa Corrections Facility Project (SAA #1600-2008-0103-R5)
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2009
Document Description
DFG is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (SAA #1600-2008-0103-R5) to the project applicant, Corrections Coporation of America. The applicant proposes to alter the stream to accommodate construction of the Otay Mesa Corrections Facility Project. The project would permanently impact ~1,075 linear ft (0.02 acre) of streambed by filling and grading. Approximately 146 linear ft of the on-site streambed would be avoided and would remainf in its natural condition. The remainder of the drainage would be re-routed tot he north side of the proposed buildings, then south along the east side of the northernmost detention basin, after which it would outfall at the western property boundary into the natural channel.
Contact Information
Name
Kelly Fisher
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Otay
Counties
San Diego
Regions
Unincorporated
Cross Streets
Otay Mesa Road and Harvest Road
Total Acres
245.79
Parcel #
646-080-04,05,08&646-240-30
State Highways
SR-125, 905
Airports
Brown Field
Township
18S
Section
18,24,
Base
SBM
Other Information
section:25
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.