North Stockton Project Annexation

13 Documents in Project

Summary

SCH Number
1992052124
Lead Agency
City of Stockton
Document Title
North Stockton Project Annexation
Document Type
NOD - Notice of Determination
Received
Posted
6/29/2006
Present Land Use
Rural housing, small commercial landscape business and agriculture, prezoned RL, RH, and CG in the City in 1990. General Plan designation is Low/Medium Density Residential, High Density Residential, and Commercial.
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2004-0516-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Grupe Investment Company. Remove 700 cy of Pixley Slough channel bottom by backhoe. Channel bottom to be restored by placement of a geotextile mat, covered with riprap, to be used as slope protection. Thirty-one 16" piles are to be driven for bridge support. Bridge footings, wingwalls, and decking shall cast in place.

Contact Information

Name
Dale A. Watkins
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
Eight Mile Road and Lower Sacramento Road
Zip
95210
Total Acres
208
Parcel #
Numerous
Railways
UPRR
Schools
Lodi USD
Waterways
Pixley Slough adjoining to the north
Township
2N
Range
6E
Section
3, 4
Base
MDB&M
Other Location Info
Pixley Slough

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print