Mesquite Regional Landfill Drainage Repairs Phase II

5 Documents in Project

Summary

SCH Number
1992051024
Lead Agency
Imperial County
Document Title
Mesquite Regional Landfill Drainage Repairs Phase II
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW is executing a Lake and Streambed Alteration Agreement (SAA # 1600-2014-0168-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant, County Sanitation District No. 2 of Los Angeles County, represented by Mr. Christopher R. Salomon, County Sanitation District No. 2 of Los Angeles County, 1955 Workman Mill Road, City of Whittier, State of California, 90601, Phone (562) 908-4288. The Applicant is proposing to partially demolish the existing culverts and add concrete box drainage culverts at two locations along the drainage channel adjacent to the rail spur at the MRL, the construction of a 100-foot transitional modification in the channel on each side of each culvert, the removal and reuse, to the extent practicable, of portions of the riprap and filter fabric in the channel, and the addition of new riprap and filter fabric at each location. A total of 0.78 acres of permanent impacts to jurisdictional streambed and a total of 0.23 acres of temporary impacts to jurisdictional streambed will result from the construction activities.

Contact Information
Leslie MacNair
CDFW Inland Deserts Region 6
3602 Inland Empire Boulevard, Suite C-220
Ontario, CA 91764

909-484-0459
909-481-2945

Location

Cities
GLAMIS
Counties
Imperial

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
County of Imperial, 801 Main Street, El Centro, CA 92243

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search