Mesquite Regional Landfill Drainage Repairs Phase II

5 Documents in Project

Summary

SCH Number
1992051024
Lead Agency
Imperial County
Document Title
Mesquite Regional Landfill Drainage Repairs Phase II
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2015
Document Description
CDFW is executing a Lake and Streambed Alteration Agreement (SAA # 1600-2014-0168-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant, County Sanitation District No. 2 of Los Angeles County, represented by Mr. Christopher R. Salomon, County Sanitation District No. 2 of Los Angeles County, 1955 Workman Mill Road, City of Whittier, State of California, 90601, Phone (562) 908-4288. The Applicant is proposing to partially demolish the existing culverts and add concrete box drainage culverts at two locations along the drainage channel adjacent to the rail spur at the MRL, the construction of a 100-foot transitional modification in the channel on each side of each culvert, the removal and reuse, to the extent practicable, of portions of the riprap and filter fabric in the channel, and the addition of new riprap and filter fabric at each location. A total of 0.78 acres of permanent impacts to jurisdictional streambed and a total of 0.23 acres of temporary impacts to jurisdictional streambed will result from the construction activities.

Contact Information

Name
Leslie MacNair
Agency Name
CDFW Inland Deserts Region 6
Contact Types
Lead/Public Agency

Location

Cities
GLAMIS
Counties
Imperial

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.