Annexation into the Lakeside Water District by M.J. Baxter Drilling Co.

9 Documents in Project

Summary

SCH Number
1992041089
Lead Agency
San Diego County
Document Title
Annexation into the Lakeside Water District by M.J. Baxter Drilling Co.
Document Type
NOD - Notice of Determination
Received
Posted
8/9/2004
Document Description
M.J. Baxter Drilling Co. is proposing to annex a net 32.2-acre parcel into the boundaries of the Lakeside Water District. The annexation will allow Baxter to use public water on all areas of the site. In order to comply with the previously approved Major Use Permit (P89-033) and Reclamation Plan (RP 93-001), Baxter must finish construction of four new industrial pads and expansion of an existing 6-acre pad. Access to public water is necessary because the Lakeside Fire Protection District has determined that an on-site well is insufficient for serving existing and future operations on the site. Connection to an existing 12-inch line, which lies within 1,500 feet of the property, would provide adequate fire flow to safely service the property. After completion of a detailed Environmental Initial Study, it has been determined that an Addendum to a previously certified Environmental Impact Report (EIR) is appropriate for adoption.

Contact Information

Name
Bob Cook
Agency Name
Lakeside Water District
Contact Types
Lead/Public Agency

Location

Cities
LAKESIDE
Counties
San Diego
Cross Streets
Vigilante Road
Total Acres
180
Parcel #
326-050-04, 11; 326-060-20, 23 & 24
State Highways
67
Township
14s
Range
1W
Section
36
Other Location Info
Lakeside

Notice of Determination

Approving Agency
Lakeside Water District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print