Water Treatment Plant and Distribution System Master Plan Project

12 Documents in Project

Summary

SCH Number
1992032043
Lead Agency
Merced County
Document Title
Water Treatment Plant and Distribution System Master Plan Project
Document Type
NOD - Notice of Determination
Received
Posted
11/13/2006
Present Land Use
Current land uses include residential and commercial development. The project area is an approved mixed use Specific Plan with zoning correspondant to planned uses.
Document Description
SNCWD proposes to construct a new water treatment plant (WTP), raw water pumping station, finished water booster pumping station, and a water distribution pipeline system to serve the development anticipated in the Santa Nella Community Specific Plan (CSP), as previously approved by the County of Merced. The proposed WTP would be constructed on an approximately 39-acre site, and would include a clarifier, two approximately 550,000 gallon settling ponds, a membrane treatment plant building, two one-million gallon storage tanks, and space for future ponds and treatment facilities. The proposed raw water pumping station would be constructed near the existing water treatment plant control building, and the proposed water booster pumping station would be located on the north side of the San Luis Canal across from the existing WTP. The water distribution system would consist of several water pipeline crossings, including two Delta-Mendota Canal crossings, three San Luis Wasteway crossings, two Outside Canal crossings, and three I-5 crossings.

Contact Information

Name
Dennis Moniz
Agency Name
Santa Nella County Water District (SNCWD)
Contact Types
Lead/Public Agency

Location

Counties
Merced
Cross Streets
I-5 & Henry Miller Road
Total Acres
2559.6
Jobs
10655
State Highways
SR-33, SR-152
Waterways
Delta-Mendola Canal, San Luis Wasteway, California Aqueduct

Notice of Determination

Approving Agency
Santa Nella County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.