Water Reuse Project

8 Documents in Project

Summary

SCH Number
1992031048
Lead Agency
City of San Luis Obispo
Document Title
Water Reuse Project
Document Type
NOD - Notice of Determination
Received
Posted
7/25/2003
Document Description
The proposed project would construct a trench across Acacia Creek to accommodate a recycled water line. A trench approximately six feet deep would be excavated across the creek channel. A ductile concrete pipe would be placed in the trench and encased in approximately 20 cubic yards of concrete, the top of which would be approximately four feet below the elevation of the streambed. The trench would then be filled with sand to a depth of approximately one-foot above the encased pipe. The trench would then be filled with native material previously excavated from the site and the site returned to its preconstruction condition. The California Department of Fish and Game is executing a Lake or Streambed Alteration Agreement Number 1600-2003-0347-3 pursuant to Section 1601 of the Fish and Game Code to the project operator, Mr. John Moss / City of San Luis Obispo.

Contact Information

Name
John Moss
Agency Name
State Water Resources Control Board-Divsion of Clean Water Prog.
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
State Highways
101
Airports
San Luis Obispo Airport
Waterways
Slo Creek

Notice of Determination

Approving Agency
The California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.