Incidental Take Permit 2081-2019-031-01, Humboldt Redwood Company Gravel Bar Extraction Project.

65 Documents in Project

Summary

SCH Number
1992013033
Lead Agency
Humboldt County
Document Title
Incidental Take Permit 2081-2019-031-01, Humboldt Redwood Company Gravel Bar Extraction Project.
Document Type
NOD - Notice of Determination
Received
Posted
8/20/2019
Document Description
The gravel extraction operations consist of the harvest of gravel, rock, and sand from specified gravel bars within the bank-full river channel along the main stem of the Eel River near Scotia. Extraction is by one or more of the following methods: skimming, horseshoe pits, alcoves, wet or dry trenches, and/or wetland pits. Extraction during 2019 is anticipated to occur at five gravel bars: Scotia Dam Bar, Lower Truck Shop Bar, Dinner Creek Bar, Three Mile, and Elinor Bar. Operations at the Dinner Creek and Lower Truck, Shop Bars also include the installation and removal of a low water temporary bridge. The Army Corps of Engineers Letter of Permission for gravel mining in Humboldt County requires the bridge to be placed after June 15 and removed before October 15.

Contact Information

Name
T.O. Smith
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
County of Humboldt
Contact Types
Project Applicant

Location

Counties
Humboldt
Other Location Info
HRC extracts gravel from the Middle Reach of the Eel River in the vicinity of Scotia, California under Vested Rights granted by Humboldt County. The upstream boundary of the Middle Eel Reach begins approximately 5. 7 miles above the confluence of the Middle and South Forks of the Eel River, and extends down river approximately 25 miles to the confluence of the main stem Eel with the Van Duzen River.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print