Incidental Take Permit No. 2081-2018-046-01,Thomas R. Bess Asphalt Company Commercial Gravel Operation

60 Documents in Project

Summary

SCH Number
1992013033
Lead Agency
Humboldt County
Document Title
Incidental Take Permit No. 2081-2018-046-01,Thomas R. Bess Asphalt Company Commercial Gravel Operation
Document Type
NOD - Notice of Determination
Received

Document Description
The project includes vehicle and heavy equipment use within the riparian corridor and bank full channel of the Van Duzen river, excavation of aggregate from exposed bar surfaces, excavation of aggregate from deposits adjacent to the low-flow summer stream channel, isolated water bodies, and secondary channels. Access to extraction site amy require the placement and removal of temporary crossings. Excavation may also occur on high floodplain areas and in areas adjacent to riparian vegetation. The annual work period occurs between June 1 and October 15, with the exception of temporary crossings, which are restricted to the work period of June 30 and October 15. Pre-extraction monitoring and planning activities begin as early as April 1 and may extend through July. Post-extraction monitoring and habitat surveys may extend through the month of November. Pre-extraction planning activities may involve travel to survey areas by passenger vehicle on existing haul roads and across exposed gravel bars of the Project site. Equipment used for excavation activities include rubber-tired loaders, tracked bulldozers, belly-scrapers, tracked excavators, large off-road haul trucks, belly dumps, dump trucks, personal vehicles, and quad runners.

Contact Information
Jennifer Olson
CDFW, Northern Region
601 Locust Street
Redding, CA 96001

707-445-5387

Location

Cities
Eureka
Counties
Humboldt
Cross Streets
110 Memory Lane
Zip
95540
Total Acres
10
Parcel #
204-072-003, 206-370-009, 206-371-010
State Highways
36, US 101
Railways
None operational
Airports
None
Schools
None
Waterways
Yager Creek, Van Duzen River
Township
2N
Range
1E
Section
29
Base
HM
Other Location Info
Carlotta

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search