SAA #04-0235 ;

65 Documents in Project

Summary

SCH Number
1992013033
Lead Agency
Humboldt County
Document Title
SAA #04-0235 ;
Document Type
NOD - Notice of Determination
Received
Posted
1/6/2006
Present Land Use
Agriculture and Gravel Extraction / Agriculture Exclusive / Agriculture Exclusive
Document Description
The original project approved the following: "the annual extraction of up to 100,000 cubic yards of river-run sand and gravel aggregate products from a three-mile stretch of the Van Duzen River near its confluence with Yager Creek. The extraction method is by "bar-skimming" --- where the upper portion of exposed point bar materials is scraped horizontally to a depth no less than one foot above the elevation of the live stream. Mined materials are transported to five stockpiling sites where the await further transport to other sites for processing. No on-site processing (e.g., washing, size-sorting, and crushing) was originally permitted for on-site. Stockpiled material transits the site by truck over one of two routes --- River Bar Road, or South Fisher Road --- onto State Highway 36." The modification involves the addition of processing of materials mined on-site including crushing, screening and washing. No increase in extraction amount is proposed. The original permit was approved in 1997.

Contact Information

Name
Michael E. Wheeler
Agency Name
Humboldt County Dept. of Community Development Services
Contact Types
Lead/Public Agency

Location

Cities
Eureka, Fortuna
Counties
Humboldt
Cross Streets
Hwy 36 / River Bar Road
Zip
95540
Total Acres
10
Parcel #
204-111-09
State Highways
36, US 101
Railways
None operational
Airports
None
Schools
None
Waterways
Van Duzen and Eel Rivers
Township
2N
Range
1E
Section
29
Base
HM

Notice of Determination

Approving Agency
Humboldt County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print