Grafton Plaza Development Project (PA 07-006)
53 Documents in Project
Summary
SCH Number
1991103064
Lead Agency
City of Dublin
Document Title
Grafton Plaza Development Project (PA 07-006)
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2009
Document Description
Amendment to the Planned Development (PD) district of the General Commercial portion of Area C and a Site Development Review (SDR) to allow the construction of the Fallon Gateway shopping center. The project site is 33.91 net acres. The existing PD for Dublin Ranch Area C was approved in 1997 and allows up to 516,992 sf of development on the project site. A Negative Declaration was adopted for the prior approval through Resolution 140-97, based on the Eastern Dublin EIR (SCH# 1991103064). The amended PD includes architectural and landscape design criteria, specific parking standards and refines the permitted, conditional and temporary uses for the entire project site. The SDR is for a portion of the total project site and consists of 27.33 net acres. The SDR will allow the construction of 10 retail buildings, which totals 311,553 sf of development. The project is within the scope of the prior reviews. No further analysis is required.
Contact Information
Name
Jeri Ram
Agency Name
City of Dublin
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Dublin
Counties
Alameda
Cross Streets
Bounded by Dublin Boulevard, Grafton Street, Clairbourne Drive, and I-580
Zip
94568
Total Acres
25.3
Parcel #
985-0061-010, 004
State Highways
I-580
Notice of Determination
Approving Agency
City of Dbulin
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.