Palomar Aggregates Quarry,( P87-021, RP87-001, Log No. 87-2-13)

8 Documents in Project

Summary

SCH Number
1991081061
Lead Agency
San Diego County
Document Title
Palomar Aggregates Quarry,( P87-021, RP87-001, Log No. 87-2-13)
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2012
Present Land Use
(18) Multiple Rural Use General Plan Designation, A70 Limited Agriculture zone. Site is currently vacant with portions of the hill in groves.
Document Description
The project is a Major Use Permit Modification and Reclamation Plan Modification to an existing construction aggregate quarry and materials processing site that includes an (1) addition of new areas outside of the current mining footprint into the mining footprint, (2) change to the Site Preparation phase boundaries, (3) revision of slope/bench configurations, (4) redesign of the access road alignments, (5) change to some of the final pad elevations, (6) redesigned smaller desillitation basin, and (7) modification of the types of mining equipment allowed. Revised conditions include allowing night-time operations of the asphalt plant and extending the expiration date of the Major Use Permit.

Contact Information

Name
Jim Bennett
Agency Name
County of San Diego
Contact Types
Lead/Public Agency

Location

Cities
Fallbrook
Counties
San Diego
Cross Streets
North side of Hwy 76 (Pala Road) & Shearer Crossing
Parcel #
125-061-06, 128-010-34
State Highways
I-15,SR-76
Waterways
San Luis Rey River
Township
9S,10S
Range
2W, 3W
Section
31,36,
Other Location Info
Fallbrook
Other Information
Section: 1 & 6 intersection

Notice of Determination

Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print