Former SPTCo Sacramento Rail Yard Soil Removal Action Workplan (RAW) for the Central Shops

8 Documents in Project

Summary

SCH Number
1991042057
Lead Agency
City of Sacramento
Document Title
Former SPTCo Sacramento Rail Yard Soil Removal Action Workplan (RAW) for the Central Shops
Document Type
NOD - Notice of Determination
Received
Posted
9/28/2006
Document Description
DTSC has prepared an Explanation of Significant Differences (ESD) for proposed changes to the approved 2003 Amendments to the Remedial Action Plan (RAP) for the Lagoon Study Area (LSA) Northwest Corner of the downtown Sacramento Railyards. The ESD has been approved by DTSC to amend the RAP administrative record to address the following changes proposed by Union Pacific Railroad: - The 10-acre Northwest Corner area proposed for capping has been expanded to include the adjacent 3.5 acre Former Oil Storage Area. - The cap design has been modified from a combination asphalt and vegetative cover to a geosynthetic barrier overlain by a minimum 2 foot thick vegetative cover. The requirements for the deed restriction and operations and maintenance plan have also been modified for consistency with the modified cap design. - Utilize inert onsite soils (up to 230,000 cubic yards) as an engineered foundation layer beneath the cap. A hierarchy of appropriate soil to be used in the foundation layer has been approved by DTSC and Regional Water Quality Control Board.

Contact Information

Name
Paul Carpenter
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
I-5/J Street/Richards Blvd.
Total Acres
1,310
State Highways
5,80,160,+
Railways
SPRR,UPRR
Schools
Various
Waterways
Sacramento/American

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print