SOUTH DELTA WATER MANAGEMENT PROGRAM
2 Documents in Project
Summary
SCH Number
1990020721
Lead Agency
California Department of Water Resources
(DWR)
Document Title
SOUTH DELTA WATER MANAGEMENT PROGRAM
Document Type
OTH - Other Document
Received
Document Description
THE PROPOSED PROJECT INCLUDES; ENLARGING CLIFTON COURT FORE- BAY FROM 2,180 SURFACE ACRES TO ABOUT 5,000 ACRES WITH NEW INTAKES AT OLD AND MIDDLE RIVERS; ENLARGING SOME EXISTING CHANNELS TO IMPROVE CONVEYANCE AND CIRCULATION; CONSTRUCTING UP TO FOUR BARRIER FACILITIES IN CHANNELS TO IMPROVE LOCAL WATER LEVELS, CIRCULATION AND WATER QUALITY; AND OBTAINING A U.S. ARMY CORPS OF ENGINEERS PERMIT TO INCREASE THE DIVER- SION CAPABILITY TO ALLOW DWR'S HARVEY O. BANKS DELTA PUMPING PLANT TO PUMP AT A MAXIMUM OF 10,300 CFS FOR WINTER BANKING.
Contact Information
Name
STEPHEN ROBERTS
Agency Name
DEPT. OF WATER RESOURCES
Contact Types
Lead/Public Agency
Phone
Location
Cities
Stockton, Tracy
Counties
Contra Costa, San Joaquin
State Highways
4
Railways
SANTA FE
Airports
TRACY AIRPORT
Waterways
OLD AND MIDDLE RIVER
Notice of Completion
State Review Period Start
State Review Period End
Project Issues
Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Economics/Jobs, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Noise, Social, Transportation, Vegetation, Wetland/Riparian, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.