El Sobrante Landfill Phase 12 Berm (Streambed Alteration Agreement No. 1600-2016-0155-R6)

10 Documents in Project

Summary

SCH Number
1990020076
Lead Agency
Riverside County
Document Title
El Sobrante Landfill Phase 12 Berm (Streambed Alteration Agreement No. 1600-2016-0155-R6)
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2016
Document Description
CDFW has executed lake and streambed alteration agreement no. 1600-2016-0155-R6, pursuant to section 1602 of the fish and game code to the project applicant. The Project includes grading the canyon slopes and importing fill to create a berm using various earth moving equipment. Three drainage features occur within the Project, with two being natural swales resulting from the canyon topography and a larger drainage that flows into Olsen Creek. The two swales will be covered with material, while a 24 inch storm drain will be placed to capture the third, larger unnamed tributary. The storm drain will convey water flow through the berm, into a 12 foot by 12 foot box with 1/2 ton riprap, where it will be directed into a concrete drainage ditch that runs along the northern perimeter of the berm.

Contact Information

Name
Kim Romich
Agency Name
CDFW Inland Deserts Region
Contact Types
Lead/Public Agency

Location

Cities
Corona
Counties
Riverside
Cross Streets
E OF I-15 & TEMESCAL CANYON RD
Total Acres
1,322
Parcel #
283-90-14,15
State Highways
I-15
Railways
AT&SF RR
Waterways
TEMESCAL CNAYON WASH
Township
4S
Range
6W5W
Section
24-2
Base
SBBM
Other Location Info
10910 Dawson Canyon Rd.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print