SAA #5-309-00

7 Documents in Project

Summary

SCH Number
1990011169
Lead Agency
Alameda Contra Costa Transit District (AC Transit)
Document Title
SAA #5-309-00
Document Type
NOD - Notice of Determination
Received
Posted
1/16/2003
Document Description
CDFG is executing a Lake Streambed Alteration Agreement (Agreement) pusuant to Section 1601 (SAA #5-2002-0367) of the Fish and Game Code to the project applicant, Mr. David Roger, Alameda Cooridor Transportation Authority. The applicant proposes to alter the streambed and banks of Dominguez Channel by replacing the existing Storm Drain Outlet with a new outlet structure to accommodate the new storm drain. The new drain will replace the existing drain and provide for drainage on the Alameda Corridor Tracts, and the existing drainage facilities to be abandoned. The work will include demolition of the existing outlet structure upon completion of the new facilities. The property is surrounded by recreational, industrial and commercial properties. The proposed project shall not impact more than 0.01 acre of stream channel, no riparian vegetation shall be impacted.

Contact Information

Name
Donna Cobb
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Waterways
L.A. RIVER

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print