City of Escondido Hale Avenue Resource Recovery Facility (HARRF) Tank Equalization Project

4 Documents in Project

Summary

SCH Number
1990010817
Lead Agency
City of Escondido
Document Title
City of Escondido Hale Avenue Resource Recovery Facility (HARRF) Tank Equalization Project
Document Type
NOD - Notice of Determination
Received
Posted
10/28/2005
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant, Mr. Patrick Thomas, representing the City of Escondido. The application proposes to alter the streambed of two unnamed drainages, tributaries to Escondido Creek, tributary to San Elijo Lagoon, tributary to the Pacific Ocean to accomodate the HARRF Tank Expansion Project. The Project consists of the construction of 2 equalization tanks, installation of associated pipeline, and replacement of a small concrete-lined ditch. Construction activity includes the grading and fill of 0.02 acre of unvegetated streambed. Approximately 0.28 acres of damaged concrete-lined channel will also be replaced, along with four 54" culverts. Three existing 36" corregated metal pipes under the access road will be replaced with three 24"concrete pipes.

Contact Information

Name
Barbara Redlitz
Agency Name
CITY OF ESCONDIDO
Contact Types
Lead/Public Agency

Location

Cities
Escondido
Counties
San Diego
Cross Streets
HALE AVENUE, 11TH STREET
Parcel #
235-051-01
State Highways
I-15
Schools
DEL DIOS MIDDLE SCHOOL
Waterways
ESCONDIDO CREEK
Township
12S
Range
2w
Section
29
Other Location Info
1521 Hale Avenue

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print