All American Canal Lining Project

6 Documents in Project

Summary

SCH Number
1990010472
Lead Agency
United States Bureau of Reclamation (USBR)
Document Title
All American Canal Lining Project
Document Type
NOD - Notice of Determination
Received
Posted
6/25/1999
Document Description
The Imperial Irrigation District (District) proposes to build a parallel concrete canal along the All-American Canal from 1.6 miles west of Rock Section 2 (1 mile west of Pilot Knob) to Drop 3 (a total of 23 miles) to conserve water lost by seepage.

Contact Information

Name
Michel D. Remington
Agency Name
Imperial Irrigation District
Contact Types
Lead/Public Agency

Location

Cities
Imperial
Counties
Imperial

Notice of Determination

Approving Agency
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print