WARM SPRINGS EXTENSION
3 Documents in Project
Summary
SCH Number
1989030065
Lead Agency
Bay Area Rapid Transit District
(BART)
Document Title
WARM SPRINGS EXTENSION
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
PROPOSED PROJECT IS A 5.4 MILE 2-STATION EXTENSION WITH 1 STATION LOCATED AT WASHIGNTON BLVD IN THE IRVINGTON DISTRICT AND 1 STATION AT GRIMMER BLVD. IN THE WARM SPRINGS DISTRICT OF FREMONT. IN ADDITION, A POTENTIAL THIRD EXTENSION STATION IN SOUTH WARM SPRINGS ALSO WILL BE ANALYZED IN THE WARM SPRINGS EXTENSION EIR. EACH EXTENSION STATION WILL BE ANALYZED AS A POTENTIAL TERMINAL STATION.
Contact Information
Name
JOAN KUGLER
Agency Name
BAY AREA RAPID TRANSIT DISTRICT (BART)
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fremont
Counties
Alameda
Cross Streets
WARM SPRINGS/FREMONT/DURHAM/WALNUT
Railways
SPRR/WPRR
Notice of Completion
State Review Period End
Development Types
Transportation:Rail (BART)
Project Issues
Aesthetics, Air Quality, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Noise, Public Services, Transportation, Wetland/Riparian
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.