Operation of City of Modesto - Phase II Expansion of the Modesto Regional Treatment Plant (Tank 13) Project (Project)

2 Documents in Project

Summary

SCH Number
1989020044
Lead Agency
Modesto, City of (City of Modesto)
Document Title
Operation of City of Modesto - Phase II Expansion of the Modesto Regional Treatment Plant (Tank 13) Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2019
Project Applicant
State Water Resources Control Board

Document Description
The City of Modesto constructed a 25-foot tall, 180 foot-diameter, 4-million-gallon tank, Industrial Tank 13, with a submersible mixer, on the southeast side of Modesto. A 15-20 feet area was paved around the tank for vehicle access. A 3,280-foot booster pump station, that includes a sodium hypochlorite room, electrical room, pumps, motors, and emergency generator, was installed to the east of the tank. A surge tank, 1.21-million-gallon detention basin, and a grassy swale was also installed,on site. Piping from Codoni Avenue to the 4-million-gallon tank, from the tank to the booster pump, and from the booster pump to the Codoni Avenue was installed See NOD for full details.

Contact Information
Bhupinder Sahota
State Water Resources Control Board Stockton District
31 E. Channel Street, Room 270
Stockton, CA 95202

Phone : (209) 948-7696

Location

Cities
Modesto
Counties
Stanislaus
Other Location Info
Near Modesto Lateral Number 1 and Codoni Avenue in Modesto within Stanislaus County

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
State Water Board, Division of Drinking Water District Office noted above. The EIR, SEIR, and Addendum is available from the lead agency.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
1989020044   PDF 820 K