Operation of City of Modesto - Phase II Expansion of the Modesto Regional Treatment Plant (Tank 13) Project (Project)

2 Documents in Project

Summary

SCH Number
1989020044
Lead Agency
City of Modesto
Document Title
Operation of City of Modesto - Phase II Expansion of the Modesto Regional Treatment Plant (Tank 13) Project (Project)
Document Type
NOD - Notice of Determination
Received
Posted
5/6/2019
Document Description
The City of Modesto constructed a 25-foot tall, 180 foot-diameter, 4-million-gallon tank, Industrial Tank 13, with a submersible mixer, on the southeast side of Modesto. A 15-20 feet area was paved around the tank for vehicle access. A 3,280-foot booster pump station, that includes a sodium hypochlorite room, electrical room, pumps, motors, and emergency generator, was installed to the east of the tank. A surge tank, 1.21-million-gallon detention basin, and a grassy swale was also installed,on site. Piping from Codoni Avenue to the 4-million-gallon tank, from the tank to the booster pump, and from the booster pump to the Codoni Avenue was installed See NOD for full details.

Contact Information

Name
Bhupinder Sahota
Agency Name
State Water Resources Control Board Stockton District
Contact Types
Lead/Public Agency

Name
Agency Name
State Water Resources Control Board
Contact Types
Project Applicant

Location

Cities
Modesto
Counties
Stanislaus
Other Location Info
Near Modesto Lateral Number 1 and Codoni Avenue in Modesto within Stanislaus County

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.