State Route Adoption Study Corridor/Route 125 S.

8 Documents in Project

Summary

SCH Number
1989011118
Lead Agency
California Department of Transportation, Headquarters
Document Title
State Route Adoption Study Corridor/Route 125 S.
Document Type
NOD - Notice of Determination
Received
Posted
6/5/2001
Document Description
California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1603 of the Fish and Game Code to the project applicant. The applicant proposes to divert and/or obstruct the natural flow, and/or change the bed, channel and/or bank fo the Sweetwater and Otay Rivers, San Miguel Creek, and several unnamed drainages, both with and without riparian vegetation, to construct 11.2 miles of new toll road. Total direct impacts to streambed are 10.58 acres. This includes 8.16 acres of impacts to riparian/wetland vegetation (5.58 acres permanent and 2.58 acres temporary), and 2.42 acres of permanent impact to unvegetated streambed. Mitigation for these impacts consists of purchase of riparian mitigation credits equivalent to 18.11 acres of lease Bell's vireo quality habitat from the Rancho Jamul Mitigation Bank for permanent impacts, and restoration of riparian and marsh habitats in areas temporarily disturbed during project construction (0.49 acre at the Sweetwater River and 2.09 acres at the Otay River).

Contact Information

Name
Pam Beare
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
RT 905/RT 54
State Highways
54/905
Airports
BROWN FIELD

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print