Holly Triangle Townhomes Project-Addendum

3 Documents in Project

Summary

SCH Number
1989010412
Lead Agency
City of Huntington Beach
Document Title
Holly Triangle Townhomes Project-Addendum
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2022
Document Description
On May 24, 2022, the Huntington Beach Planning Commission approved the following actions as they pertain to the approximately 2.11-acre parcel, identified above: (1) Tentative Tract Map No 19118 (TTM) and (2) Conditional Use Permit No. 20-025 (CUP). On June 21 , 2022, the Huntington Beach City Council Commission approved the following actions as they pertain to the approximately 2.11-ac;e parcel, identified above: (1) General Plan Amendment (GPA) No. 20-003 by adopting Resolution No. 2022-19; (2) Zoning Text Amendment (ZTA) No. 20-003 by adopting Ordinance No. 4256; (3) Addendum No. 1 by adopting Resolution 2022-26. The GPA amends the land use designation from Commercial Neighborhood-Specific Plan Overlay (CN-sp) to Residential Medium Density-Specific Plan Overlay (RM-sp). The ZTA amended the existing zoning designation within the Holly -Seacliff Specific Plan (SP9) from Commercial (C) to Residential Medium Density (RM). The TIM consolidated 12 lots into a 1.80 net acre lot for condominium purposes. The CUP allows development of 35 three-story attached town homes up to 40 feet tall and allows 43-inch and 6-foot-tall walls in lieu of 42-inch walls in the 10-foot front yard setback along Holly Lane and 6-foot-tall walls in lieu of 42-inch walls in the 15-foot front yard setback area along Main Street. The Project proposes to develop a 2.11 gross-acre site, including the demolition of the existing building on the site, capping the four existing oil wells, and constructing 35 three-story townhomes within 7 buildings, with 15 percent affordable units, as welI as with parking, landscape, and common use amenities.

Contact Information

Name
Alyssa Helper
Agency Name
City of Huntington Beach
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
Regions
Southern California
Cross Streets
Holly Lane, Garfield Avenue, Main St
Zip
92648
Total Acres
2.11

Notice of Determination

Approving Agency
City of Huntington Beach
Approving Agency Role
Lead Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
https://www.huntingtonbeachca.gov/government/departments/planning/major/major-projects-view.cfm?ID=106

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.