Orange County Fair and Exposition Center Master Plan

7 Documents in Project

Summary

SCH Number
1989010088
Lead Agency
Orange County
Document Title
Orange County Fair and Exposition Center Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/21/2011
Present Land Use
Fairgrounds/Institutional and Recreational
Document Description
On August 23, 2003, the 32nd DAA certified EIR SCH no. 1989010088 and approved the Master plan for the Orange County Fair and Exposition Center, On December 15, 2011, the 32nd DAA determined that the scope of current improvements to the Pacific Amphitheater are within the scope of the approve Master Plan and the Environmental Impact Report prepared for the Master Plan (SCH No. 1989010088). The project description for the improvements to the Pacific Amphitheater considered in the Master Plan EIR included the removal of the earthen berm that was used for the seating of 10,000 people, reducing the capacity of the amphitheater to 8,500 seats; and the refurbishment of the amphitheater box office and hard surface plaza and the addition of landscaping materials. The current improvements include the removal of only a portion of the berm to relocate the entry point consistent with the master Plan and the refurbishment of box office/ticketing facilities and landscaping improvements. These improvements are only a portion of the improvements considered in the Master Plan EIR and are consistent with the overall Master Plan.

Contact Information

Name
Jerome Hoban
Agency Name
32nd District Agricultural Association (DAA)
Contact Types
Lead/Public Agency

Location

Cities
Costa Mesa
Counties
Orange
Cross Streets
Newport Boulevard/Arlington Drive
Zip
92626
Total Acres
7.5
State Highways
SR 55
Airports
Orange County
Schools
Elementary and Community College
Waterways
Newport Back Bay

Notice of Determination

Approving Agency
32nd District Argricultural Association
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print