Crown Valley Village
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1988122609
- Lead Agency
- Riverside County
- Document Title
- Crown Valley Village
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/24/2002
- Document Description
- CDFG is executing a Lake and Streambed Alteration Agreement (SAA #6-2001-171) pursuant to Section 1603 of the Fish and Game Code to the project applicant, Richland Pinehurst, LP. The applicant proposes to construct 253 single-family residential lots, 1 park site, 1 detention basin, and 1 open space lot located on an approximate 90 acre site. The project includes the construction of Algarve Avenue from Winchester Road to provide access to the tract and the widening of Winchester Road as required under County recommended project conditions. The existing storm drain facility, which involves an unnamed drainage that flows under Winchester Road, through an existing storm drain channel, and into the southeastern portion of the site, is comprised of an 80-foot long, triple 10-foot by 9-foot box culvert. The project proposes to extend the culvert approximately 140 feet to allow the road improvements.
- Contact Information
-
Juan Hernandez
Department of Fish and Game
Lead/Public Agency
330 Golden Shore Suite 250
Long Beach, CA 90802
Phone : (707) 272-4965
Location
- Cities
- RANCHO CALIFORNIA
- Counties
- Riverside
- Total Acres
- 166
- State Highways
- 79
- Airports
- FRENCH VALLEY
- Waterways
- TUCALOTA CREEK
- Township
- 7S
- Range
- 2W
- Section
- 8
Notice of Determination
- Approving Agency
- Department of Fish and Game
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.