EAST MISSION GORGE INTERCEPTOR CIP #43-104(EQD 88-0089)
2 Documents in Project
Summary
SCH Number
1988092105
Lead Agency
City of San Diego
Document Title
EAST MISSION GORGE INTERCEPTOR CIP #43-104(EQD 88-0089)
Document Type
EIR - Draft EIR
Received
Document Description
CONSTRUCTION OF A SEWAGE PUMP STATION AND A 48-INCH DIAMETER WASTEWATER FORCE MAIN PIPELINE, EXTENDING APPROXIMATELY 42,000 FEET FROM SANTEE TO THE EASTERN END OF MISSION VALLEY. THE PROPOSED PROJECT WOULD PROVIDE HYDRAULIC RELIEF FOR THE EXISTING EAST MISSION GEORGE INTERCEPTOR SEWER, WHICH IS NEAR ITS SEWAGE TRANSPORT CAPACITY.
Contact Information
Location
Cities
SAN DIEGO MISSION GEORGE AREA
Counties
San Diego
Cross Streets
MISSION GEORGE RD, FATHER JUNIPERO
Waterways
SAN DIEGO RIVER
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, Habitat Conservation Planning (CDFW), California Department of Health Care Services (DHCS), California Department of Transportation, District 11 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Resources Agency, State Water Resources Control Board, Division of Loans and Grants, State Water Resources Control Board, Division of Water Quality
Development Types
Water Facilities (Supply)
Project Issues
Air Quality, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hydrology/Water Quality, Land Use/Planning, Noise, Sewer Capacity, Transportation, Vegetation, Wetland/Riparian, Wildlife, Other
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.