Condition R-1 Review

5 Documents in Project

Summary

SCH Number
1988051115
Lead Agency
Livermore Valley Joint Unified School District
Document Title
Condition R-1 Review
Document Type
NOD - Notice of Determination
Received
Posted
10/23/2001
Document Description
The project involves the review of the operating status of the Gaviota Oil and Gas Processing Facility (Gaviota facility). The Gaviota facility provides onshore processing support for three platforms on the Outer Continental Shelf. The Gaviota facility also serves as one of Santa Barbara County's two designated oil and gas processing consolidation sites for offshore production along the South Coast. Condition R-1 of the Gaviota facility Final Development Plan (85-FDP-032) requires that the County hold a public hearing on the operating status of the Gaviota facility oil or gas processing throughput falls below 3% of the maximum permitted throughput. In October 1998 the facility operator ceased sending sour gas to shore, triggering R-1 review. The EIR prepared for the review process examined a number of possible future operating scenarios for the Gaviota facility, the includes partial abandonment of the Gaviota facility and initiation of zoning and policy amendments.

Contact Information

Name
Steve Chase
Agency Name
Santa Barbara County Planning and Development, Energy Division
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Mariposa Reina
Zip
93117
Total Acres
51
Parcel #
81-130-07,81-130-52
State Highways
101
Railways
Southern Pacific
Schools
Vista Del Mar Cabandone
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
Santa Barbara County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print