Silva Valley Parkway Interchange Project Supplemental Environmental Impact Report
10 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1988050215
- Lead Agency
- El Dorado County
- Document Title
- Silva Valley Parkway Interchange Project Supplemental Environmental Impact Report
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/10/2012
- Present Land Use
- Residential High Density and Commercial
- Document Description
- The proposed project will construct a new interchange on U.S. Highway 50 at Silva Valley Parkway in El Dorado Hills. Referred to as the "Ridge Design" Alternative (approved by the Board in 1990), proposed improvements include: loop on-ramps in the northeast and southwest quadrants; diagonal on-and off-ramps in each direction; an overcrossing for Silva Valley Parkway; safety lighting; on-ramps designated to accommodate future ramp metering and HOV lanes.
- Contact Information
-
Janet Postlewait
El Dorado County DOT
Lead/Public Agency
2850 Fairlane Court
Placerville, CA 95667
Phone : (530) 621-5993
Location
- Coordinates
- 38°39.6'"N 121°3.0'"W
- Counties
- El Dorado
- Cross Streets
- U.S. Highway 50 and Silva Valley Parkway
- Zip
- 95762
- State Highways
- U.S. Hwy 50
- Schools
- Oak Meadow Elementary
- Waterways
- Carson Creek
- Township
- 9N
- Range
- 8E
- Section
- 1
- Base
- MDB&M
- Other Location Info
- City/Nearest Community: El Dorado Hills
Notice of Determination
- Approving Agency
- El Dorado County Board of Supervisors
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- El Dorado County Offices (Building C, Dot Office), 2850 Fairlane Court, Placerville, CA 95667
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.