Silva Valley Parkway Interchange Project Supplemental Environmental Impact Report

10 Documents in Project

Summary

SCH Number
1988050215
Lead Agency
El Dorado County
Document Title
Silva Valley Parkway Interchange Project Supplemental Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2012
Present Land Use
Residential High Density and Commercial

Document Description
The proposed project will construct a new interchange on U.S. Highway 50 at Silva Valley Parkway in El Dorado Hills. Referred to as the "Ridge Design" Alternative (approved by the Board in 1990), proposed improvements include: loop on-ramps in the northeast and southwest quadrants; diagonal on-and off-ramps in each direction; an overcrossing for Silva Valley Parkway; safety lighting; on-ramps designated to accommodate future ramp metering and HOV lanes.

Contact Information
Janet Postlewait
El Dorado County DOT
2850 Fairlane Court
Placerville, CA 95667

Phone : (530) 621-5993

Location

Coordinates
38°39.6'"N 121°3.0'"W
Counties
El Dorado
Cross Streets
U.S. Highway 50 and Silva Valley Parkway
Zip
95762
State Highways
U.S. Hwy 50
Schools
Oak Meadow Elementary
Waterways
Carson Creek
Township
9N
Range
8E
Section
1
Base
MDB&M
Other Location Info
City/Nearest Community: El Dorado Hills

Notice of Determination

Approving Agency
El Dorado County Board of Supervisors
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
El Dorado County Offices (Building C, Dot Office), 2850 Fairlane Court, Placerville, CA 95667

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search