UPPER CACTUS BASINS FLOOD CONTROL PROJECT

11 Documents in Project

Summary

SCH Number
1987110914
Lead Agency
San Bernardino Flood Control District
Document Title
UPPER CACTUS BASINS FLOOD CONTROL PROJECT
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2003
Document Description
CDFG is executing a Lake and Streambed Alteration Agreement (SAA # 6-2002-193) pursuant to Section 1601 of the Fish and Game Code to the project applicant. The Operator proposes to alter the streambed to: 1. remove two existing thirty-inch pipes crossing Baseline Road and croncrete inlet wall section 2. placement of a 214 linear foot of pre-cast reinforced concrete box under Baseline Road: 3. grading and constructing 758 linear feet of a concrete rock channel downstream of Baseline Road: and 4. grading and constructing of a concreted-rock slope where two existing side drains enter the channel. The project will result in the evacuation of approximately 14,680 cubic yards of soil. The Operator shall not impact more than 1.0 acre of stream channel. No vegetation shall be impacted. All impacts are permanent. The Operator shall mitigate at a 1:1 replacement to impact ratio for the permanent loss of the stream channel with one of the following: a) The operator shall restore 1.0 acre of stream habitat at a department approved location within the Santa Ana watershed. b) The Operator shall purchase credits equivalent to 1.0 acre from Cajon Creek Conservation Bank prior to commencing project activities.

Contact Information

Name
Ken Miller
Agency Name
California Department of Fish & Game Eastern Sierra-Inland
Contact Types
Lead/Public Agency

Location

Cities
Rialto
Counties
San Bernardino
Cross Streets
Between Baseline/Easton/Ayala/Cactus
Total Acres
140
State Highways
30/66
Airports
Rialto Muni
Township
1N
Range
5W
Section
34

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print