STORM DRAINAGE MASTER PLAN

2 Documents in Project

Summary

SCH Number
1987102715
Lead Agency
City of Woodland
Document Title
STORM DRAINAGE MASTER PLAN
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Document Description
ANALYZE MASTER PLAN INTO 2 AREAS INCLUDING: ADDITIONAL LOCAL COLLECTION LINES OR LATERALS TO PROVIDE SAME LEVEL OF SERVI- CE THROUGHOUT THE CITY; TRUNK EXPA REDUCE PEAK RUNOFF FLOW RATES AND DOWNSTREAM TRUNK SYSTEM COSTS; ALTERNATIVE SYSTEMS FOR DISPOSAL OF RUNOFF INCLUDING PUMP STATIONS WITH DISCHARGE LINES

Contact Information

Name
TIM BACH
Agency Name
WOODLAND CITY
Contact Types
Lead/Public Agency

Location

Cities
Woodland
Counties
Yolo
Total Acres
123
Waterways
SACTO RIVER/CACHE CK

Notice of Completion

State Review Period Start
State Review Period End
Development Types
Other (DRAINAGE PLAN)
Local Actions
Master Plan
Project Issues
Flood Plain/Flooding, Geology/Soils, Growth Inducement, Noise, Transportation, Vegetation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print