Mckanna Ranch: Lake Perris Project (Specific Plan & EIR)

3 Documents in Project

Summary

SCH Number
1987011910
Lead Agency
City of Perris
Document Title
Mckanna Ranch: Lake Perris Project (Specific Plan & EIR)
Document Type
NOD - Notice of Determination
Received
Posted
5/23/2003
Document Description
Construct and operate an elementary school to accommodate 650 students in grades K through 5 on an approximately 10-acre site. The proposed project will inlcude 24 standard classrooms, 3 kindergarten classrooms, administrative offices and a library/media center, a multi-use facility and kitchen, and an outdoor eating area. The seven buildings will vary in size from approximately 4,400 to 8,800 square feet. Recreational facilities will include two play systems with safety surface, a baseball field, a softball field, a soccer (turf play) field, and ball-wall courts. On-site paking will be provided for 108 vehicles. Separate auto drop-off areas will be provided for the elementary and kindegarten students, and a bus drop-off will be located on the east side of Avalon Parkway (Main Street).

Contact Information

Name
Sandee Hackett
Agency Name
Val Verde Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Perris
Counties
Riverside
Total Acres
252
State Highways
60, I-215
Airports
March AFB
Waterways
Lake Perris
Other Location Info
245 Acres McCanna Ranch

Notice of Determination

Approving Agency
Val Verde Unified School District Board of Education
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A