Serrano Village K1 K2 Phase 4 Pedestrian Trail

21 Documents in Project

Summary

SCH Number
1986122912
Lead Agency
El Dorado County
Document Title
Serrano Village K1 K2 Phase 4 Pedestrian Trail
Document Type
NOD - Notice of Determination
Received
Posted
5/9/2022
Document Description
The Project will consist of the grading of approximately 1.09 acres within the existing oak woodland and riparian area along Allegheny Creek and an unnamed intermittent drainage to allow for the installation of a pedestrian trail and three culverts. The pedestrian trail will be five-feet wide with a one-foot-wide shoulder on either side. Two culverts will be approximately 7 foot long, with a 24-inch diameter and one culvert will be approximately 7 foot long, with a 30-inch diameter. The culverts will be comprised of high-density polyethylene and sized to allow for future overland flow of stormwater.

Contact Information

Name
Caitlyn Oswalt
Agency Name
Department of Fish and Wildlife
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Counties
El Dorado
Regions
Northern California
Parcel #
123-630-008-000
Other Location Info
The project is located at Allegheny Creek.

Notice of Determination

Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
El Dorado
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of execution of the above Lake and Streambed Alteration Agreement as Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print