Simi Valley Landfill and Recycling Center-Expansion of Existing Facility; Simi Valley Landfill and Recycling Center (Conditional Use Permit 3142

6 Documents in Project

Summary

SCH Number
1986111234
Lead Agency
Ventura County
Document Title
Simi Valley Landfill and Recycling Center-Expansion of Existing Facility; Simi Valley Landfill and Recycling Center (Conditional Use Permit 3142
Document Type
NOD - Notice of Determination
Received
Posted
5/15/2003
Present Land Use
MSW Landfill/ Zoning: Open Space 160-acre minimum lot size/ General Plan: Open Space (Urban Reserve).
Document Description
Revised Solid Waste Facility Permit to increase permitted traffic from 806 vehicles per day to 822 vehicles per day, permitted area from 174 acres to 297.45 acres, increase disposal footprint from 138 acres to 185.61 acres, increase permitted capacity from 23.7 million cubic yards to 43.5 million cubic yards, change estimated closure date from 2004 to 2022 and change the maximum permitted elevation from 1110 ft above mean sea level to 1118 feet above mean sea level.

Contact Information

Name
Leslee Newton-Reed
Agency Name
Ventura County, Resource Management Agency, Planning
Contact Types
Lead/Public Agency

Location

Cities
Simi Valley
Counties
Ventura
Cross Streets
Madera Road/ State Route 118
Zip
93009-1600
Total Acres
297
Parcel #
615-0-150-24, 25, 26 et al
State Highways
SR 118
Railways
Union Pacific RR
Schools
Arroyo, Madera, Park View, Sinaloa
Waterways
Arroyo Simi
Township
3N
Range
18W
Section
31,32
Base
SBBM

Notice of Determination

Approving Agency
California Integrated Waste Management Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print