Sweetwater Reservoir Recreation Master Plan
16 Documents in Project
Summary
SCH Number
1985101602
Lead Agency
Sweetwater Authority
Document Title
Sweetwater Reservoir Recreation Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
3/14/2003
Present Land Use
The majority of the project site is vacant, zoned S-80 (Open Space Use); and designated "Impact Sensitive" (permitting a residential density of one dwelling unit per 4, 8, and 20 acres (I DU/4,8, and 20 ac.). A single-family residential unit is located on APN 585-112-07 (3.76-acre). That parcel is zoned RR1 and designated as "1 Residential".
Document Description
The project consists of a shoreline fishing program that will allow public recreation along 2.5 miles of the southwest shoreline of Sweetwater Reservoir and consists of the following elements: widening of the existing onsite maintenance road; improvement of existing trails; construction of a 150-space parking lot on San Miguel Point; installation of water lines, irrigation, native landscaping, and portable restrooms. The project will result in impacts to Otay tarplant, which is protected under the California Endangered Species Act.
Contact Information
Name
Pete Famolaro
Agency Name
County of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Cities
Chula Vista
Counties
San Diego
Cross Streets
San Miguel Road
Zip
91902
Total Acres
~300
Parcel #
585-100-15;585-112-07,-50; 585-170-01,-05,-06,-07;585-161-02
State Highways
54
Schools
Sunnyside Elementary School
Waterways
Sweetwater Reservoir and Sweetwater River
Township
17S
Range
1W
Section
16
Base
Jamul Mt
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.