Sweetwater Reservoir Recreation Master Plan

16 Documents in Project

Summary

SCH Number
1985101602
Lead Agency
Sweetwater Authority
Document Title
Sweetwater Reservoir Recreation Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2001
Present Land Use
The majority of the project site is vacant, zoned S-80 (Open Space Use); and designated "Impact Sensitive" (permitting a residential density of one dwelling unit per 4, 8, and 20 acres (I DU/4,8, and 20 ac.). A single-family residential unit is located on APN 585-112-07 (3.76-acre). That parcel is zoned RR1 and designated as "1 Residential".
Document Description
Shoreline Fishing Program to allow public recreation along 2.5 miles of the southwest shoreline of Sweetwater Reservoir. This project has been reduced from that analyzed in the 1987 Final EIR and consists of the following phased elements: Use of existing residence for office/concession building; widen existing onsite maintenance road; improve existing trails; construct a 150-space parking lot; and install water lines, irrigation, landscaping, and portable restrooms. Installation of sewer to residential unit; annexation to Bonita-Sunnyside Fire Protection District.

Contact Information

Name
Ms. Troy Murphree
Agency Name
Sweetwater Authority
Contact Types
Lead/Public Agency

Location

Cities
Chula Vista
Counties
San Diego
Cross Streets
San Miguel Road
Zip
91902
Total Acres
~300
Parcel #
585-100-15;585-112-07,-50; 585-170-01,-05,-06,-07;585-161-02
State Highways
54
Schools
Sunnyside Elementary School
Waterways
Sweetwater Reservoir and Sweetwater River
Township
17S
Range
1W
Section
16
Base
Jamul Mt

Notice of Determination

Approving Agency
Board of Directors of Sweetwater Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.