Addendum No. 2 to the Final EIR for the Sweetwater Reservoir Urban Runoff Diversion System
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 1985042404
- Lead Agency
- Sweetwater Authority
- Document Title
- Addendum No. 2 to the Final EIR for the Sweetwater Reservoir Urban Runoff Diversion System
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/28/2018
- Present Land Use
- Communications and Utilities; Open Space Park or Preserve / Public / Semipublic Facilities / Public Agency Lands
- Document Description
- The proposed modifications to the previously certified environmental impact report for the Urban Runoff Diversion System Phase 1 (URDS 1) include modifications of a staging area associated with the URDS 1 and on-site disposal of soils recently dredged from the URDS 1 detention ponds and forebays, consistent with a conditional waiver of waste discharge requirements.
- Contact Information
-
Israel Marquez
Sweetwater Authority
Lead/Public Agency
505 Garret Ave
Chula Vista, CA 91910
Phone : (619) 409-6759
Location
- Coordinates
- 32°42'21"N 116°59'10"W
- Cities
- SPRING VALLEY
- Counties
- San Diego
- Cross Streets
- Jamacha Blvd and Reservoir Drive
- Zip
- 92075
- Total Acres
- 12.88
- Parcel #
- 58001008, 1015, 1053, 58420057
- State Highways
- Hwy 124 / 54
- Schools
- La Presa ES
- Waterways
- Sweetwater Reservoir, Sweetwater River
- Other Location Info
- Spring Valley Community
Notice of Determination
- Approving Agency
- Sweetwater Authority
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.