Nighthawk Energy Storage Project
6 Documents in Project
Summary
SCH Number
1984053008
Lead Agency
City of Poway
Document Title
Nighthawk Energy Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
9/6/2024
Document Description
The Project will construct underground transmission lines using jack-and-bore methods under Beeler Creek and two unnamed drainages. The underground bore will drill into the earth from the sending pit on one end to the receiving pit on the other end, removing materials. A permanent casing pipe will be installed within each bore hole. Soil from the pits will be temporarily stored on site and then used to backfill each pit after each boring completion. Any excess soil will be removed from the Project site. Equipment will be staged outside of the streams. Access to the site will occur from existing roads and developed lands. Project activities are anticipated to take up to six months.
Contact Information
Name
Jennifer Blackhall
Agency Name
California Department of Fish and Wildife
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Poway
Counties
San Diego
Regions
Southern California
Other Information
Bore 1 is located at Beeler Creek in the City of Poway; Latitude 32.927650, Longitude -117.039650. Bore 2 is located at the confluence of two unnamed drainages that are tributaries to Los Peñasquitos Creek; Latitude 32.921921, Longitude -117.033814
Notice of Determination
Approving Agency
California Department of Fish and Wildife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.